Ripping out and replacing 1,850 SF of old sidewalk, plus 810 SF of new concrete to improve connectivity across the community.
Park City, UT
Municipal Ogden, UT
The Scope
A full teardown and rebuild: demo of the old shed, culinary and sewer utilities, 3,900 CY of structural backfill, footings and piers, a 3,200 SF building pad, an 80' x 40' pre-fab building, rock retaining walls, asphalt prep, and site grading.
Related Work
HOA
Ripping out and replacing 1,850 SF of old sidewalk, plus 810 SF of new concrete to improve connectivity across the community.
Park City, UT
HOA
Removing and replacing 600 LF of 5' sidewalk, adding 200 LF of new sidewalk, rebuilding the concrete steps, and re-landscaping the disturbed areas.
Park City, UT
HOA
3,000 SF of new concrete sidewalks, 50 HOA garden boxes with drainage, soils, and individual irrigation, 35,000 SF of grading and native grass hydroseeding, 3,000 SF of decorative cobble rock, and 11 trees on drip irrigation.